Things to Do · 探

Liziba Monorail Station

Line 2 runs straight through a 19-story apartment block. The viewing platform is below.

45 min · Line 2
Chongqing CRT Line 2 monorail emerging straight out of a residential building at Liziba Station
CRT Line 2 emerging from floors 6–8 of the residential tower at Liziba.

Overview

At Liziba Station, Chongqing’s elevated Line 2 monorail passes directly through the 6th to 8th floors of a 19-story residential apartment building. The station and building were engineered together with independent structural pillars and noise-damping rubber tires so residents barely feel the trains pass. For the full experience, ride the train through the building first, then head down to street level to watch the next train disappear into the concrete.

Quick Facts
Getting there
CRT Line 2 · Liziba Station (李子坝站), Exit A
Best time
Before 10:00 or late afternoon for softer light
Time needed
30–45 minutes
Cost
Free viewing platform (metro fare ¥2–¥5)

Getting There

How to Reach It

Take CRT Line 2 directly to Liziba Station (李子坝站) — standing near the front car gives you a driver’s-eye view as the track dives into the building. After tapping out, follow the signs for Exit A down several flights of escalators/elevators to street level and cross via the pedestrian crossing to the dedicated Liziba Viewing Platform (李子坝观景平台).

Good to Know

Practical Tips

  • Trains pass every 3–5 minutes in both directions, so there is no need to rush your photo.
  • Walk 50 meters along the riverside path past the main tour-group crowd for cleaner angles with fewer raised phones.
  • Combine Liziba with a scenic downhill stroll along the nearby Half-Mountain Cliff Trail (半山崖线) or head straight on Line 2 toward Jiefangbei.

Show to staff or drivers

Planning a trip and have a question?

If something is missing, unclear, or out of date, drop us a note — we read every message and keep the guide growing for the next traveler.

Write to us